LOLER & PUWER INSPECTION & CERTIFICATION
The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) require statutory thorough examinations by a ‘competent person’ to ensure your lifting gear is safe and compliant. Our inspection engineers are fully qualified to perform LOLER inspections every 6 or 12 months, depending on equipment type. We also offer PUWER compliance testing for work equipment across Kent, Essex, Surrey & London.
We offer a full range of on-site LOLER and PUWER 6 and 12 month certification in
- London
- Kent
- Essex
- Surrey
All of our engineers are P.T.S rail Qualified multi-fleet deals arranged.
LOLER Inspections & Certification
At Shear Excellence, we provide thorough LOLER (Lifting Operations and Lifting Equipment Regulations 1998) inspections and certification to ensure your lifting equipment is safe, compliant, and fully documented. Based in Kent, we cover London, Essex, and Surrey, delivering reliable inspection services for businesses of all sizes.
What is LOLER?
LOLER (Lifting Operations and Lifting Equipment Regulations 1998) is a UK law designed to ensure that all lifting equipment is safe to use. Employers are legally required to have their lifting equipment examined by a competent person at regular intervals, with full certification provided.
Our LOLER Inspection Services
-
6-month and 12-month LOLER inspections (depending on equipment type)
-
Full certification to demonstrate compliance with HSE regulations
-
Inspections carried out by experienced, qualified engineers
-
Support across a wide range of lifting equipment, including plant machinery, excavators, and attachments
Why Choose Shear Excellence?
✅ Experienced, fully certified inspectors
✅ Fast, reliable service across London, Kent, Essex & Surrey
✅ Competitive pricing with no compromise on quality
✅ Peace of mind knowing your equipment is legally compliant
Book a LOLER Inspection Today
Don’t risk fines or unsafe equipment. Contact us today to arrange your LOLER inspection and certification.
CAT · Caterpillar · Concrete Crusher · Cummins · Doosan · Flowfit · Hitachi · International Iseki · JCB · Komatsu · Manitou· New Holland · Mercedes Unimog · Volkswagen
Read the LOLER regulations here.
FAQ Section
-
How long does a thorough examination take? Typically 30–60 minutes per machine, depending on condition and documentation history.
-
Who qualifies as a competent person? Our engineers are experienced, independent and P.T.S‑qualified.
-
What happens if a fault is found? Defects are recorded and reported immediately, followed by a detailed written report and certification.
